TY - JOUR AU1 - Sheremet, V. AU2 - Kekukh, A. AU3 - Dudnik, Yu. AU4 - Levchik, A. AU5 - Vinichenko, R. AB - Laboratory and full-scale testing of rebar samples with different types of corrosion prevention are conducted in conditions corresponding to storage and transportation. The Metalantikor composition proves most effective. Optimal operating conditions in the rolling mill line are selected, so as to minimize coating consumption. The concentration of toxics in the workplace does not exceed the mean limiting permissible values. Outdoor tests and inspection of rebar batches at the customers’ premises confirm that the selected approach is correct. TI - Corrosion protection of rebar in a continuous mill JF - Steel in Translation DO - 10.3103/S0967091211010116 DA - 2011-05-01 UR - https://www.deepdyve.com/lp/springer-journals/corrosion-protection-of-rebar-in-a-continuous-mill-FC6DV9IlY1 SP - 58 EP - 60 VL - 41 IS - 1 DP - DeepDyve ER -