Access the full text.
Sign up today, get DeepDyve free for 14 days.
A. Costa (1999)
X̄ Charts with Variable ParametersJournal of Quality Technology, 31
A. Costa (1998)
VSSI X̄ charts with sampling at fixed timesCommunications in Statistics-theory and Methods, 27
A. Costa (1994)
X̄ charts with variable sample sizeJournal of Quality Technology, 26
Michael Saccucci, R. Amin, J. Lucas (1992)
Exponentially weighted moving average control schemes with variable sampling intervalsCommunications in Statistics - Simulation and Computation, 21
S. Prabhu, D. Montgomery, G. Runger (1994)
A Combined Adaptive Sample Size and Sampling Interval X Control SchemeJournal of Quality Technology, 26
A. Costa (1993)
JOINT ECONOMIC DESIGN OF X¯ AND R CONTROL CHARTS FOR PROCESSES SUBJECT TO TWO INDEPENDENT ASSIGNABLE CAUSESIie Transactions, 25
G. Runger, J. Pignatiello (1991)
Adaptative sampling for process controlQuality Engineering, 36
M. Reynolds, R. Amin, J. Arnold, J. Healy, J. Lucas, Michael Saccucci, W. Woodall (1990)
CUSUM charts with variable sampling intervalsTechnometrics, 32
A. Costa (1997)
X̄ Chart with Variable Sample Size and Sampling IntervalsJournal of Quality Technology, 29
R. Baxley (1995)
An Application of Variable Sampling Interval Control ChartsJournal of Quality Technology, 27
(1995)
Joint economic design of X¯ and R charts with adaptive dual sampling policy
I. Chengalur, J. Arnold, M. Reynolds (1989)
Variable sampling intervals for multiparameter shewhart chartsCommunications in Statistics-theory and Methods, 18
A. Costa (1999)
Joint X̄ and R Charts with Variable Sample Sizes and Sampling IntervalsJournal of Quality Technology, 31
G. Runger, D. Montgomery (1993)
ADAPTIVE SAMPLING ENHANCEMENTS FOR SHEWHART CONTROL CHARTSIie Transactions, 25
C. Atwood, M. Engelhardt (1996)
Techniques for Uncertainty Analysis of Complex Measurement ProcessesJournal of Quality Technology, 28
(1996)
An alternative model for the economic design of X¯ and R control charts under non-Mar-kovian shock models the renewal theory approach
(1996)
Economic design of X¯ and R control charts under Weibull shock models
Marion Reynolds, Raid Amin, Jesse Arnold, J. Nachlas (1988)
X charts with variable sampling intervalsTechnometrics, 30
R. Amin, Richard Miller (1993)
A Robustness Study of Charts with Variable Sampling IntervalsJournal of Quality Technology, 25
S. Prabhu, G. Runger, J. Keats (1993)
X¯ chart with adaptive sample sizesInternational Journal of Production Research, 31
M. Reynolds, J. Arnold, J. Baik (1996)
Variable Sampling Interval X Charts in the Presence of CorrelationJournal of Quality Technology, 28
(1993)
An adaptive sample size X¯ chart, 31
M. Reynolds (1996)
Shewhart and EWMA Variable Sampling Interval Control Charts with Sampling at Fixed TimesJournal of Quality Technology, 28
Abstract Recent studies have shown that the X¯ chart with variable parameters (Vp X¯ chart) detects process shifts faster than the traditional X¯ chart. This article extends these studies for processes that are monitored by both, X¯ and R charts. Basically, the X¯ and R values establish if the control should or should not be relaxed. When the X¯ and R values fall in the central region the control is relaxed because one will wait more to take the next sample and/or the next sample will be smaller than usual. When the X¯ or R values fall in the warning region the control is tightened because one will wait less to take the next sample and the next sample will be larger than usual. The action limits are also made variable. This paper proposes to draw the action limits (for both charts) wider than usual when the control is relaxed and narrower than usual when the control is tightened. The Vp feature improves the joint X¯ and R control chart performance in terms of the speed with which the process mean and/or variance shifts are detected.
IISE Transactions – Taylor & Francis
Published: Jun 1, 1998
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.